Mission Profile: Near-Term Instrument Schedule
The 3-nadir scans per sequence Global Surveys resumed on July 3, 2005, still one-day-on followed by one-day-off.
There will be one nadir observation every 1.7 degree latitude along the orbits.
|
Science Observations schedule to be provided in a future update. |
TES Global Survey Start Times for Oct2005-Oct2006 (.pdf)
Note that TES will perform detector de-ice at about 2-month interval, so a GS (Global Survey) or two will be deleted. Some GS
will also be deleted due to maneuver conflicts.
|